FLFailureLab.ENGENHARIA APLICADA
PTOpen tool
FAILURELAB • ENGINEERING KNOWLEDGE

I-MR control chart — how to use, example and results

Explore individual observations and moving ranges of two points.

I chart15.98118.095.7520.210.522.3115.2524.4220OrderObservationCenterLCLUCL
Illustrative example · fictional data

When to use

To monitor individual measurements in time order without rational subgroups.

Required inputs

Comparable, approximately independent sequential observations with a unit.

How to apply in FailureLab

Calculate moving range |Xi−Xi−1|; estimate limits from a reference phase; investigate special points before recalculating limits.

What the tool delivers

Individuals and moving-range charts; small samples produce preliminary statistical limits.

Worked example (fictional)

A stable temperature sequence followed by a point outside limits suggests a process change to check.

Cautions and limitations

Control limits are not specifications; autocorrelation, load changes and small samples can distort results.

Tool fields

Try this method with an example

Supporting references

Educational support. Actual investigations require evidence, risk assessment, applicable criteria and validation by responsible professionals. References do not imply standards compliance.

Turn knowledge into investigation

Use the methods in the software, organize evidence and export a report. Free, no sign-up.

Open FailureLab